Look into refactoring the proof scheduler logic in order to simplify proven tip logic.
Won't this be much simpler if we pass the proof back to the scheduler, who can then arrange and insert the blocks in order?
Originally posted by @Mirko-von-Leipzig in #1987 (comment)
Look into refactoring the proof scheduler logic in order to simplify proven tip logic.
Won't this be much simpler if we pass the proof back to the scheduler, who can then arrange and insert the blocks in order?
Originally posted by @Mirko-von-Leipzig in #1987 (comment)