Skip to content

Update SG6000-CN documentation to include steps for power supplies #46

@JamieLove-Net2

Description

@JamieLove-Net2

Page: Replace SG6000-CN controller

The Net2 team received the following feedback from the field:
4. Remove and replace the SG6000-CN controller:

a. Label the cables and then disconnect the cables and any SFP+ or SFP28 transceivers.
To prevent degraded performance, do not twist, fold, pinch, or step on the cables.
b. Remove the failed controller from the cabinet or rack.

<-----need to transfer power supplies but doesn't mention in the procedure

c. Install the replacement controller into the cabinet or rack.
d. Replace the cables and any SFP+ or SFP28 transceivers.
e. Power on the controller and monitor the controller LEDs and boot-up codes.

Metadata

Metadata

Assignees

Labels

documentationImprovements or additions to documentation

Type

No type

Projects

No projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions