Skip to content

Follow-up: validate SSSC planner parity + signing rollout from PR #1497 #1683

@WilliamBerryiii

Description

@WilliamBerryiii

Summary

Track follow-up validation and rollout checks for the SSSC Planner parity/signing update introduced in #1497.

Context

PR #1497 aligns SSSC Planner behavior with RAI parity and introduces:

  • disclaimer gating and persisted consent timestamp
  • SSSC state schema and expanded state fields
  • session-path signing support and manifest updates
  • footer-with-review tier updates
  • prompt flow restructuring across entry modes

Acceptance Criteria

  • Verify end-to-end SSSC planner flow across capture and from-artifact modes in a real repo scenario.
  • Validate artifact signing flow using Sign-PlannerArtifacts.ps1 -SessionPath and confirm manifest/state linkage.
  • Confirm reviewer-facing footer tiers are applied consistently for all SSSC instruction outputs.
  • Capture any regressions and open follow-up PR(s) as needed.

References

Metadata

Metadata

Labels

instructionsCopilot instruction files (.instructions.md)maintenanceMaintenance work, no version bump

Type

No type
No fields configured for issues without a type.

Projects

No projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions