This issue is replicated from the archived project SAP-archive#8. See there for the details.
Besides, are also seems to be a related issue with RBE2-elements, when some of their slave nodes have other constraints through SPC/SPC1 Nastran entries. The couplings through the RBE2 is then ignored. Instead the master-slave relationship should be inverted.
This issue is replicated from the archived project SAP-archive#8. See there for the details.
Besides, are also seems to be a related issue with RBE2-elements, when some of their slave nodes have other constraints through SPC/SPC1 Nastran entries. The couplings through the RBE2 is then ignored. Instead the master-slave relationship should be inverted.