SE302

Scheduler Module


This module is the core of the Exam Planner. It uses a constraint-based probabilistic backtracking algorithm to generate conflict-free exam schedules.

Features

  • Constraint Checking:
    • Student Conflicts: Ensures no student is scheduled for two exams at the same time.
    • Room Capacity: Verifies that assigned classrooms have enough capacity for the enrolled students.
    • Daily Load Limit: Enforces a maximum of 2 exams per student per day.
  • Optimization:
    • Prioritizes hard courses (those with high conflict degrees) to minimize backtracking.
    • Automatically calculates the minimum required days based on course volume and student load.
    • Assigns the largest courses to the largest available rooms to maximize space efficiency.
  • Reliability:
    • Timeout Protection: Includes a timeout mechanism to prevent freezing on impossible schedules(set to 10 seconds).
    • Random Restart: Uses randomized restarts based on a geometric distribution to escape local optima during the search process."

Algorithm Overview

The scheduler uses a Randomized Backtracking approach with Heuristic Sorting:

  1. Graph Generation: A conflict graph is built where nodes are courses and edges represent shared students.
  2. Sorting: Courses are sorted by degree of conflict (descending) and then by enrollment size. This ensures the most difficult-to-schedule courses are placed first.
  3. Optimal Start Calculation: The system calculates a theoretical minimum number of days required before starting, checking both total volume and per-student daily limits.
  4. Solving:
    • The solver attempts to assign a valid time slot to each course recursively.
    • If a valid slot is found that satisfies all constraints (Time, Room, Student Load), it proceeds to the next course.
    • If no slot is found, it backtracks.
  5. Room Assignment: Once a valid time schedule is generated, rooms are assigned using a Best Fit strategy, matching large classes to large rooms.