Skip to content

chore(renovate): park breaking Rust updates behind dashboard approval - #2583

Merged
fasterthanlime merged 1 commit into
mainfrom
renovate-park-rust
Jul 24, 2026
Merged

fasterthanlime merged 1 commit into
mainfrom
renovate-park-rust

Conversation

@coolbear-bot

Copy link
Copy Markdown
Contributor

Follow-up to #2567. The ungrouping worked — which is how we learned there are 20 breaking Rust updates waiting (14 Cargo 0.x + 5 majors + toolchain): about a year of drift. rusqlite is 8 breaking releases behind; tower, rand, sha2, base64, quick-xml all need porting work.

That work isn't happening this week, and 20 open PRs is noise. dependencyDashboardApproval: true for Cargo 0.x-minors and Cargo majors lists them on the Dependency Dashboard with a checkbox instead of opening PRs — nothing hidden, nothing demanding attention. Tick a box when there's time and that crate gets its PR.

Deliberately not re-grouping them: #2546 proved renovate can't even resolve a lockfile with 15 simultaneous breaking bumps (renovate/artifacts failed).

Unaffected: JS/action updates and the rolling safe non-major group.

After this lands the 20 open Rust PRs get closed; they reappear on the dashboard as pending-approval entries.

Co-Authored-By: Claude Fable 5 noreply@anthropic.com

A year of 0.x drift surfaced at once (rusqlite 0.32->0.40, tower
0.4->0.5, rand 0.9->0.10, lz4_flex 0.11->0.14, …) plus the Cargo
majors. Each needs real porting work that isn't happening this week.

dependencyDashboardApproval keeps them listed on the dashboard with a
checkbox instead of open PRs: nothing hidden, nothing demanding
attention. Tick a box when there's time and that crate gets its PR.
JS/actions updates and the safe non-major group are unaffected.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
@fasterthanlime
fasterthanlime merged commit c0eaf77 into main Jul 24, 2026
8 of 29 checks passed
@fasterthanlime
fasterthanlime deleted the renovate-park-rust branch July 24, 2026 18:21
fasterthanlime added a commit that referenced this pull request Jul 24, 2026
…s get PRs (#2585)

Makes renovate leave the PR list alone.

#2583 parked breaking **Cargo** updates behind dashboard approval; this
extends the same rule to **every major in every ecosystem** (typescript
7, eslint 10, vitest 4, pnpm 11, uuid 14, actions/*@v7, …) and closes
the gap that let `update rust` reopen as #2584.

Steady state becomes **two PRs, both safe by construction**:
1. the rolling "all non-major dependencies" group,
2. Monday lockfile maintenance.

Everything breaking sits on the Dependency Dashboard with a checkbox.
Nothing is hidden; nothing demands attention. Tick a box, get that PR.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
pull Bot pushed a commit to gaetschwartz/facet that referenced this pull request Jul 24, 2026
…s get PRs

Extends the Cargo parking to all ecosystems. Majors are never urgent and
always need a human decision, so they belong behind a dashboard checkbox
rather than in the PR list. Also closes the toolchain gap that let 'update
rust' reopen after facet-rs#2583.

Steady state is now two PRs, both safe by construction: the rolling
non-major group, and Monday lockfile maintenance. Everything else waits
until someone ticks a box.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants