Skip to content
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
1 change: 1 addition & 0 deletions STATUS.md
Original file line number Diff line number Diff line change
Expand Up @@ -20,6 +20,7 @@
|---|---|---|---|
| LinkedIn (primary demand lane) | **LIVE** — 3 posts published (2026-08-13/18/19), first metrics read 2026-08-20; ICP-E lane on disk: 1 posted + 4 approved (of 10 planned), validation clock running | Post an approved draft (week1-tue / week1-wed) at Stream 0 cadence (3-4/wk) | [`metrics-ledger`](linkedin-posts/metrics-ledger.md) · [`plan`](docs/workflows/linkedin-icp-validation-plan.md) |
| 2608 site design system (v2 `/next/` rail) | Paused 2026-08-22 mid-flight; 3 pilots built + voted | Apply the [repositioned pilot copy](docs/projects/2608-site-design-system/20-29-strategy/20.09-repositioned-pilot-copy.md) (2608's own 20.09 — not the content plan); then Paul's 5 decisions | [`2608 README`](docs/projects/2608-site-design-system/README.md) |
| Positioning / homepage offer (2608 niche research + [ADR-0007](docs/adr/0007-homepage-main-offer-and-copy.md)) | **Paused 2026-08-22** — 8 research lanes complete, copy drafted + panel-voted, nothing shipped to the live site; landed on master via [#606](https://github.com/jetthoughts/jetthoughts.github.io/pull/606) | Resume via the HANDOFF — read its corrections first: the staffing constraint was briefed backwards, so every lane's discards need re-reading before acting on a shortlist | [`HANDOFF`](docs/projects/2608-niche-research/HANDOFF.md) |
| Blog / SEO (2510) | Constrained by 20.09 §1 (outreach first). R-queue empty/retired; replacement queue is §13 (restocked 2026-08-21) | Per §1: LinkedIn cadence + sourcing outrank a new post; when drafting, take §13 N-queue | [`20.09 §13`](docs/projects/2510-seo-content-strategy/20-29-strategy/20.09-content-plan-revision-aug-2026.md) |
| 2605 course | v2 live; measuring. Diagnosis: **arrival, not content**; course SEO/AEO **closed** (Paul 2026-08-21) | LinkedIn arrival-test cards **LI-0…LI-D** in [`content-plan`](linkedin-posts/content-plan.md); no new funnel posts on the unproven bridge | [`TASK-TRACKER`](docs/projects/2605-tech-for-non-technical-founders/TASK-TRACKER.md) |
| 2607 campaign tasks | Cold-public-sourcing premise tested and **failed** (3 sweeps, 4 venues, 0 verified-fresh rows; Reddit still un-openable) | Sept-restart Paul decision: retire the cold lane or buy Reddit API access (backlog §c) | [`2607 backlog`](docs/projects/2607-vibe-code-rescue/backlog.md) |
Expand Down