-
Notifications
You must be signed in to change notification settings - Fork 1.2k
Pull requests: volcano-sh/volcano
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
chore(deps): bump k8s.io/kubernetes from 1.34.1 to 1.34.2
dependencies
Pull requests that update a dependency file
go
Pull requests that update go code
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#4816
opened Dec 16, 2025 by
dependabot
bot
Loading…
fix restart task/partition when pod evicted
kind/bug
Categorizes issue or PR as related to a bug.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#4815
opened Dec 15, 2025 by
ouyangshengjia
Loading…
feat:add kubebuilder validation markers
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#4813
opened Dec 13, 2025 by
FAUST-BENCHOU
Loading…
Support task level network topology constrain with minSubGroups
kind/feature
Categorizes issue or PR as related to a new feature.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#4810
opened Dec 12, 2025 by
3sunny
Loading…
agent scheduler: bring in 3rd dependency for agent scheduling queue
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#4805
opened Dec 11, 2025 by
qi-min
Loading…
[WIP]Create a new Agent scheduler for Agent workload fast scheduling
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#4804
opened Dec 11, 2025 by
qi-min
Loading…
agent scheduler: design doc update
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#4801
opened Dec 11, 2025 by
qi-min
Loading…
Support network topology constrain with highestTierName
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#4795
opened Dec 11, 2025 by
zhaoqi612
Loading…
Refactor reclaim action
kind/bug
Categorizes issue or PR as related to a bug.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#4794
opened Dec 10, 2025 by
guoqinwill
Loading…
Add a new Scheduler to support Agent workload scheduling
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#4787
opened Dec 8, 2025 by
qi-min
Loading…
add inspector for dryrun
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#4783
opened Dec 8, 2025 by
weapons97
Loading…
Optimize CI with reusable image workflow
area/ci
Issues or PRs related to volcano CIs
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#4782
opened Dec 4, 2025 by
Deepam02
Loading…
Gang aware eviction design doc
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#4780
opened Dec 3, 2025 by
vzhou-p
Loading…
Fix: vNPU HAMi mode may not work with multi-type NPUs cluster
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#4779
opened Dec 3, 2025 by
kiritoxkiriko
Loading…
add sharding controllers to support node partitioning among multiple scheduler
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#4777
opened Dec 2, 2025 by
ssfffss
Loading…
feat: add context dumping for failed e2e tests
area/test
CI and test related Issues or PRs
lgtm
Indicates that a PR is ready to be merged.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#4767
opened Nov 30, 2025 by
neeraj542
Loading…
support ttl metrics for volcano-scheduler.
kind/feature
Categorizes issue or PR as related to a new feature.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#4760
opened Nov 28, 2025 by
fengruotj
Loading…
feat: add errtasks rate limited for retryResync task.
kind/feature
Categorizes issue or PR as related to a new feature.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#4754
opened Nov 26, 2025 by
fengruotj
Loading…
[WIP] Test for agent-scheduler branch ci
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#4752
opened Nov 26, 2025 by
JesseStutler
Loading…
# [Feature] Add Liveness and Readiness Probes to Core Deployments
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#4746
opened Nov 24, 2025 by
AxcelBlaze003
Loading…
chore(deps): bump golang.org/x/crypto from 0.39.0 to 0.45.0
dependencies
Pull requests that update a dependency file
go
Pull requests that update go code
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#4741
opened Nov 20, 2025 by
dependabot
bot
Loading…
Proposal: Allow dry-run scheduling for workloads
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#4740
opened Nov 20, 2025 by
weapons97
Loading…
[Cherry-pick 1.13] Fix scheduler panic by moving InitKubeSchedulerRelatedMetrics outside…
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#4735
opened Nov 18, 2025 by
JesseStutler
Loading…
[Cherry-pick 1.12] Fix scheduler panic by moving InitKubeSchedulerRelatedMetrics outside…
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#4734
opened Nov 18, 2025 by
JesseStutler
Loading…
chore(deps): bump github.com/opencontainers/selinux from 1.11.1 to 1.13.0
dependencies
Pull requests that update a dependency file
go
Pull requests that update go code
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#4730
opened Nov 18, 2025 by
dependabot
bot
Loading…
Previous Next
ProTip!
Follow long discussions with comments:>50.