Skip to content

Pull requests: kubevirt/user-guide

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

Fix table rendering with CSS specificity override dco-signoff: yes Indicates the PR's author has DCO signed all their commits. size/M
#1023 opened Aug 11, 2026 by aburdenthehand Member Loading…
8 tasks
Fixed stale live migration docs dco-signoff: yes Indicates the PR's author has DCO signed all their commits. size/L
#1020 opened Jul 23, 2026 by Aseeef Member Loading…
8 tasks done
docs: WorkloadEncryptionSEV Alpha -> Beta Graduation dco-signoff: yes Indicates the PR's author has DCO signed all their commits. size/S
#1016 opened Jul 1, 2026 by alancaldelas Contributor Loading…
1 of 8 tasks
docs: add storage migration RBAC permissions section dco-signoff: yes Indicates the PR's author has DCO signed all their commits. size/M
#1015 opened Jun 29, 2026 by akalenyu Contributor Loading…
8 tasks
Fix grammar in migration policies documentation dco-signoff: no Indicates the PR's author has not DCO signed all their commits. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. size/XS
#1010 opened Jun 24, 2026 by leahSinger14 Contributor Loading…
docs, host-devices: Add SR-IOV vGPU preparation section dco-signoff: yes Indicates the PR's author has DCO signed all their commits. lgtm Indicates that a PR is ready to be merged. needs-approver-review Indicates that a PR requires a review from an approver. size/S
#1009 opened Jun 17, 2026 by xpivarc Member Loading…
docs: update PersistentReservation to GA, replace gate with config dco-signoff: yes Indicates the PR's author has DCO signed all their commits. size/S
#1007 opened Jun 11, 2026 by akalenyu Contributor Loading…
8 tasks
net: add DRA SR-IOV user guide dco-signoff: yes Indicates the PR's author has DCO signed all their commits. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/L
#989 opened Apr 26, 2026 by oshoval Contributor Draft
8 tasks
compute: add PCI topology and hotplug port reservation docs approved Indicates a PR has been approved by an approver from all required OWNERS files. dco-signoff: yes Indicates the PR's author has DCO signed all their commits. size/L
#980 opened Mar 18, 2026 by mhenriks Member Loading…
8 tasks
ProTip! Find all pull requests that aren't related to any open issues with -linked:issue.